Tariffs for the Co-location service
| EQUIPMENT | COST FOR 1 CALENDAR MONTH, SUM |
|---|---|
| Hosting a 1U server * | 672 000 |
| Hosting a 2U server * | 840 000 |
| Hosting a 3U server * | 1 008 000 |
| For each subsequent 1U, for a server larger than 3U (without power supply) | 168 000 |
| Placement of 1U network equipment up to 100 Watts | 252 000 |
| Installation of equipment | Included in the Server Hosting service |
| Connection to the power grid with a power of up to 500 Watts inclusive | |
| 1 1 Gb/s full-duplex connection port | |
| Access to the Internet at a speed of 10 Mbit/s, without organizing traffic** | |
| Access to the TAS-IX, UZ-IX network at a speed of 100 Mbit/s, without traffic organization** | |
| Additionally: |
|
| Electricity consumption for each full or incomplete 100W over 500W | 84 000 |
| Allocation of a single IP address | in accordance with the current price list |
| Additional power to the server | 84 000 |
| Additional/backup port: |
|
| 1 Gb/s full-duplex | 117 600 |
| 10 Gb/s full-duplex | 336 000 |
* The Server Hosting service includes installation of equipment, connection to an electrical network with a capacity of up to 500 Watts inclusive, 1 1 Gb/s full-duplex connection port, allocation of one IP address, Internet access at a speed of 10 Mbit/s, and access to the TAS-IX, UZ-IX network at a speed of 100 Mbit/s, without traffic restrictions.
** At the request of the subscriber, it is possible to increase the speed of Internet access to more than 10 Mbit/s, and in TAS-IX, UZ-IX more than 100 Mbit/s. In this case, the increase in speed is paid at the current rates.
When the outgoing Internet access speed increases relative to the incoming one, payment for the increased outgoing speed is carried out in the amount of 30% of the cost of the current tariff plan for Internet access services, "Uz-IX" and "TAS-IX", for each 1 Mbit/s, respectively. In case of an increase in the outgoing speed at several connection points, the subscription fee for the increased outgoing speed for each point is calculated separately.